OSHA's control of hazardous energy standard, 29 CFR 1910.147, sets two recurring duties. First, the employer must conduct a periodic inspection of each energy control procedure at least annually. Second, the employer must train employees before they work under the program and retrain them when specific changes or problems occur. The standard does not set a calendar interval for retraining. It is driven by events, and the annual inspection is one of the main ways those events are found.
Who Needs Lockout/Tagout Training
Paragraph 1910.147(c)(7)(i) says training must make sure employees understand the purpose and function of the energy control program and acquire the knowledge and skills to apply, use and remove energy controls safely. The content depends on the employee's role, as defined in paragraph (b):
| Role | Who it is | Required training |
|---|---|---|
| Authorized employee | A person who locks out or tags out machines or equipment to perform servicing or maintenance | Recognizing applicable hazardous energy sources, the type and magnitude of energy available in the workplace, and the methods and means needed for energy isolation and control |
| Affected employee | An employee who operates or uses a machine being serviced under lockout or tagout, or who works in the area where that servicing happens | The purpose and use of the energy control procedure |
| Other employees | Anyone whose work operations are or may be in an area where energy control procedures may be used | The procedure, and the prohibition on attempting to restart or reenergize machines that are locked out or tagged out |
An affected employee becomes an authorized employee when their duties come to include servicing or maintenance covered by the standard. At that point they need the authorized employee training. Paragraph (c)(8) also says lockout or tagout may be performed only by the authorized employees who are performing the servicing or maintenance.
Extra Training Where Tags Are Used
When tagout systems are used, paragraph (c)(7)(ii) requires training on the limitations of tags. Employees must learn that:
- Tags are essentially warning devices and do not provide the physical restraint of a lock.
- A tag is not to be removed without authorization of the authorized person responsible for it, and is never to be bypassed, ignored or otherwise defeated.
- Tags must be legible and understandable by all authorized employees, affected employees and others in the area.
- Tags and their means of attachment must withstand the environmental conditions in the workplace.
- Tags may evoke a false sense of security, and their meaning has to be understood as part of the overall program.
- Tags must be securely attached so they cannot be inadvertently or accidentally detached.
When Retraining Is Required
Paragraph 1910.147(c)(7)(iii) lists the triggers. Retraining must be provided for all authorized and affected employees whenever there is:
- A change in their job assignments
- A change in machines, equipment or processes that presents a new hazard
- A change in the energy control procedures
Additional retraining is also required whenever a periodic inspection reveals, or the employer has reason to believe, that there are deviations from or inadequacies in an employee's knowledge or use of the energy control procedures. Retraining must reestablish employee proficiency and introduce new or revised control methods and procedures as needed.
Many employers choose to refresh LOTO training on a fixed schedule as well, but that is a company policy choice. The federal text ties retraining to the events above. Providers who can deliver or update this training are listed in our safety training and consulting directory and the OSHA training finder.
Periodic Inspection: At Least Annually
Paragraph 1910.147(c)(6)(i) requires the employer to conduct a periodic inspection of the energy control procedure at least annually to make sure the procedure and the standard's requirements are being followed. The standard sets these conditions:
- Who inspects: an authorized employee other than the one(s) using the energy control procedure being inspected.
- Purpose: the inspection is conducted to correct any deviations or inadequacies identified.
- Lockout procedures: the inspection includes a review, between the inspector and each authorized employee, of that employee's responsibilities under the procedure being inspected.
- Tagout procedures: the review covers each authorized and affected employee, and also includes the tag limitations listed in paragraph (c)(7)(ii).
Because the inspection is of the energy control procedure, plan it procedure by procedure. Each documented procedure in your program needs its own inspection at least once a year.
What to Certify and Document
The standard requires two separate certifications.
| Certification | Required contents | Rule |
|---|---|---|
| Periodic inspection | The machine or equipment on which the procedure was used, the date of the inspection, the employees included, and the person performing the inspection | 1910.147(c)(6)(ii) |
| Training | Each employee's name and dates of training; the employer certifies training has been accomplished and is being kept up to date | 1910.147(c)(7)(iv) |
A simple log per procedure, with the inspector's name, the date, the equipment and the employees reviewed, covers the inspection certification. A training roster with names and dates covers the training certification. Keep both current, since the training certification must show training is being kept up to date.
Procedures That Need Not Be Written Down
Paragraph (c)(4)(i) requires energy control procedures to be developed, documented and used. A note to that paragraph exempts documenting a procedure for a particular machine only when all of these apply: no potential for stored or residual energy or its reaccumulation after shutdown; a single energy source that can be readily identified and isolated; isolating and locking out that source completely deenergizes the machine; the machine is isolated and locked out during servicing; a single lockout device achieves a locked-out condition; the device is under the exclusive control of the authorized employee; the work does not create hazards for other employees; and the employer has had no accidents involving unexpected activation or reenergization of that machine during servicing. The exception covers documentation only, not training.
Group Lockout and Testing
When a crew, craft or department does the servicing, paragraph (f)(3) requires a group procedure that gives each employee protection equivalent to a personal lockout or tagout device, with primary responsibility vested in an authorized employee for a set number of workers. Paragraph (f)(1) sets the sequence to follow when lockout or tagout devices must be temporarily removed to test or position a machine. Both belong in training for the employees who use them.
Annual LOTO Checklist
- List every energy control procedure and schedule an inspection for each at least once a year.
- Assign an authorized employee who does not use that procedure as the inspector.
- Review responsibilities with each authorized employee, and with affected employees where tags are used.
- Certify the machine, date, employees included and inspector.
- Retrain after job, equipment, process or procedure changes, or when the inspection finds gaps.
- Keep the training certification with names and dates up to date.
- Stock locks, tags and hasps from safety equipment suppliers, and check the related gear in our PPE checklist.
General information, not legal advice. Rules change and State Plan states may differ, so confirm with the current standard or your state agency.